Melrose Gold Project
The Melrose Project is located immediately adjacent to Black Cat Syndicate’s (ASX: BC8) Paulsens Gold Project in the Pilbara region of WA.
Aruma completed a maiden drilling program at the Melrose Project in 2022, which consisted of 48 RC holes (to depths of around 100 metres) for 4,784 metres, on 10 lines of drilling. Drilling was designed to define gold grades and controls on mineralisation along with lithology, mineralisation types, metallurgy and stratigraphy. The program intersected anomalous gold and confirmed the presence of anomalies on an east-west structural target at the Gossan Hill target. Further details on the Melrose Project and exploration results from the Project can be found in Aruma’s ASX announcements.

